Notice: A non well formed numeric value encountered in /home/powerexi/public_html/wp-content/plugins/script-insert/inc/php/versioning.php on line 41
NEW FirstCall™ Manifolds | POWEREX Notice: Function WP_Scripts::localize was called incorrectly. The $l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/powerexi/public_html/wp-includes/functions.php on line 5833
Notice: Function WP_Scripts::localize was called incorrectly. The $l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/powerexi/public_html/wp-includes/functions.php on line 5833
Notice: Function WP_Scripts::localize was called incorrectly. The $l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/powerexi/public_html/wp-includes/functions.php on line 5833
Notice: Function WP_Scripts::localize was called incorrectly. The $l10n parameter must be an array. To pass arbitrary data to scripts, use the wp_add_inline_script() function instead. Please see Debugging in WordPress for more information. (This message was added in version 5.7.0.) in /home/powerexi/public_html/wp-includes/functions.php on line 5833
The Powerex FirstCall™ fully-automatic medical gas manifolds deliver an uninterrupted supply of medical gas to a facility. The manifold is cleaned, tested, and prepared for the intended medical gas service. It is constructed in accordance with requirements of the latest edition of NFPA 99 and CGA.
Industry-leading flow capacity
7” high-resolution touchscreen HMI graphically displays bank pressure, primary/secondary bank status, final line pressure, changeover set point, and alarm status
System logic controlled by next generation PLC technology
Ethernet connectivity using BACnet over IP protocol to building management system – available
Designed and manufactured in the USA
5 year warranty on parts, 2 year warranty on labor
Cylinder x Cylinder Manifold Fully Automatic Digital
Liquid x Liquid
MFLD-LIQ-NFPA-GG-PSI
Liquid x Liquid Manifold Fully Automatic Digital
Model
Description
Spec Sheet
Manual
Lab Liquid Manifold
MFLD-LIQ-GG-PSI
Laboratory Liquid Manifold Fully Automatic Digital
Model
Description
Spec Sheet
Cylinder x Cylinder Headers
HDR-STGD-GG-NXN-36C
Staggered Headers with Copper Pigtails for Cylinder x Cylinder Manifolds
HDR-STGD-GG-NXN-36S
Staggered Headers with Stainless Steel Flexible Pigtails for Cylinder x Cylinder Manifolds
HDR-VERT-GG-NXN-36C
Vertical Headers with Copper Pigtails for Cylinder x Cylinder Manifolds
HDR-VERT-GG-NXN-36S
Vertical Headers with Stainless Steel Flexible Pigtails for Cylinder x Cylinder Manifolds
Liquid x Liquid Headers
HDR-LIQ-GG-NXN-72
Staggered Headers with Stainless Steel Flexible Pigtails for Liquid x Liquid Manifolds
Emergency Reserve Headers for Liquid Manifolds
HDR-ERESV-STGD-GG-N-36C
Emergency Reserve Staggered Headers with Copper Pigtails for Liquid x Liquid Manifolds
HDR-ERESV-STGD-GG-N-36S
Emergency Reserve Staggered Headers with Stainless Steel Flexible Pigtails for Liquid x Liquid Manifolds
HDR-ERESV-VERT-GG-N-36C
Emergency Reserve Vertical Headers with Copper Pigtails for Liquid x Liquid Manifolds
HDR-ERESV-VERT-GG-N-36S
Emergency Reserve Vertical Headers with Stainless Steel Flexible Pigtails for Liquid x Liquid Manifolds
Built by Powerex in Harrison, OH
5 year warranty on parts, 2 year warranty on labor
Industry-leading flow capacity
7” high-resolution touchscreen HMI graphically displays bank pressure, primary/secondary bank status, final line pressure, changeover set point, and alarm status
System logic controlled by next generation PLC technology
Ethernet connectivity using BACnet over IP protocol to building management system – available
Final line pressure transducer eliminates the need for an additional high/low pressure switch
Robust changeover design using dome-loaded primary regulators controlled by dual solenoids
Robust piston-style final line regulator
Removable cabinet enclosure for improved service access
Single point vent connection
Maintenance mode
Push-button bank changeover
¾” source valve included
Easy mounting bracket system
NEMA 4 enclosure optional
Heaters optional for Nitrous Oxide and Carbon Dioxide